Hydraulically Activated Tools for the First Stage of a Completion System

TREX™ Toe Subs

The Toe-XT™ Testable Hydraulic Sleeve, Toe-AP™ Hydraulic Sleeve and TREX Wet Shoe Sub lower the operational risk associated with coiled tubing runs for the first stage of cemented liner completion systems. These technologies are cost-effective and operationally flexible, helping customers save time and reduce risk when establishing communication with the reservoir post-cementing and prior to stimulation operations.

TREX Toe Subs

Toe-XT Testable Hydraulic Sleeve

Allows the casing string to be pressure tested a single time before opening.

Toe-AP Hydraulic Sleeve

Opens at a specific absolute pressure, saving time and cost in delivering an effective treatment of the first stage.

TREX Wet Shoe Sub

Eliminates the need for a coiled tubing run to perforate the first stage in plug-and-perf operations.

Toe-XT Hydraulic Sleeve

Learn more about pressure-testable toe sleeves with the Toe-XT Hydraulic Sleeve

Toe-XT Hydraulic Sleeve

Check out this case study and find out how the Toe-XT Hydraulic Sleeve is used to pressure test casing integrity prior to stimulation operations

Read more

Effective stimulation with Packers Plus TREX cemented completion system

For more information, contact a sales manager in your region.

Contact Us

 

 

Our systems & solutions