StackFRAC HD-X enables higher pump rates and tonnage for increased production in extended reach lateral
Wireline shifting BHA enables operator to reduce operation costs and benefit from flexibility of closeable sliding sleeves
Montney operator achieves high stage count stimulation with minimal operation time deploying StackFRAC HD-X
Deep Dive into Shallow Wells: Best practices for successful completion system installation and stimulation in shallow wells
Keeping Connected: 6 remedies to prevent casing deformation and maintain wellbore integrity for a successful completion
PrimeSET Liner Hanger combines with flotation sub to simplify extended reach lateral installation
Robust liner hanger enables rotating while circulating for successful installation in challenging formation
Packers Plus dissolvable plug maintains isolation for successful completion during challenging stimulation program
Toe-XT Testable Hydraulic Sleeve enables high pressure casing test and sleeve opening below formation frac pressure
TREX Setting Sleeve Simplifies Re-fracturing Operations to Reduce Time, Cost and Risk
LightningPLUS Composite Plug overcomes casing deformation issues to simplify installation and deliver successful stimulation
Inferno Ball-Activated Steam Valve Ensures Effective Steam Injection and Reduces Operational Time in SAGD Horizontal Wells

LightningPLUS Composite Plug Mills Out Quickly With Minimal Debris
Packers Plus Specialty Tool Prevents Costly Remediation
Operator Stimulates Screened Offshore System 3 Years After Installation
Toughen Up: Mitigate erosion for high-volume proppant completions
Multiply Your Coverage: Maximizing well economics with multi-lateral well completions
Toe-XT Hydraulic Sleeve successfully activated after 8 months
QuickFRAC system provides effective fracture isolation and higher production for limited entry completions
Titanium XV custom-designed for extended stimulation of geothermal well
Float installations lower costs in extended reach laterals
191442 – Getting More Out of Your Multistage Fracturing Openhole Completion
Go with the Flow: Reduce Water Costs Using Continuous Pumping Completions
Innovative offshore multi-lateral completion results in top producer

Load More