StackFRAC HD-X enables higher pump rates and tonnage for increased production in extended reach lateral
Wireline shifting BHA enables operator to reduce operation costs and benefit from flexibility of closeable sliding sleeves
Montney operator achieves high stage count stimulation with minimal operation time deploying StackFRAC HD-X
Deep Dive into Shallow Wells: Best practices for successful completion system installation and stimulation in shallow wells
Keeping Connected: 6 remedies to prevent casing deformation and maintain wellbore integrity for a successful completion
PrimeSET Liner Hanger combines with flotation sub to simplify extended reach lateral installation
Robust liner hanger enables rotating while circulating for successful installation in challenging formation
Packers Plus dissolvable plug maintains isolation for successful completion during challenging stimulation program
Toe-XT Testable Hydraulic Sleeve enables high pressure casing test and sleeve opening below formation frac pressure
TREX Setting Sleeve Simplifies Re-fracturing Operations to Reduce Time, Cost and Risk
LightningPLUS Composite Plug overcomes casing deformation issues to simplify installation and deliver successful stimulation
Inferno Ball-Activated Steam Valve Ensures Effective Steam Injection and Reduces Operational Time in SAGD Horizontal Wells

Load More