StackFRAC® HD-X

Next generation ball-activated system for high stage count completions and optimal treatment rates

The new and improved StackFRAC HD-X multi-stage completion system was specifically designed to provide high stage count completions and enable optimal treatment rates – even at the toe of the well – by reducing wellbore ID restrictions compared to previous iterations of the system. This next generation system was engineered with ball seat increments exceeding the industry standard of 1/16-in. and the latest version can include increments as small as 1/40-in., while proprietary erosion protection ensures each activation ball will land on its corresponding ball seat.

Packers Plus has been a leader in lower completion technology since 2000 and the engineering advancements of StackFRAC HD-X are the result of more than 20 years of continuous innovation. This ball-activated completion system enables a stimulation program to be pumped from start to finish in one continuous operation and is backed by a fully integrated QA/QC process to verify manufacturing precision and operational success at the wellsite.

StackFRAC HD-X is the next generation of ball-activated completions, allowing operators to effectively increase stage counts for extended reach lateral well stimulations

Read more

Montney operator achieves high stage count stimulation with minimal operation time deploying StackFRAC HD-X

Read more

Montney operator achieves top tier returns with StackFRAC HD-X

Read more

StackFRAC HD-X increases stage count for extended reach lateral wells

Read more

Explore all case studies, white papers and SPE papers

Learn more about Open Hole Multi-Stage Completions with StackFRAC HD-X

Prefer to talk to a person? Fill out the form in the link below and a knowledgeable member of our sales team will be in touch.

Our systems & solutions

E-Commerce

Packers Plus tools readily available at the click of a button

Featured Completion Products

Lightning Frac Plug

The Packers Plus Lightning™ Frac Plug combines composite and cast iron slips to firmly lock the plug in place and provide zonal isolation in the wellbore during plug-and-perf completions.

BUY NOW

 

FracPORT Sleeve

The FracPORT™ Sleeve is a ball-activated stimulation and production port. This sliding sleeve is run between two packers to isolate specific zones of the wellbore for targeted hydraulic fracturing.

BUY NOW

 

RockSEAL II Packer

The RockSEAL® II packer is a dual-element open hole packer that provides high-performance zone isolation, ensuring stimulation of the targeted zone and isolation to optimize long-term production.

BUY NOW

 

Prefer to talk to a person?

Fill out the form in the link below and a knowledgeable member of our sales team will be in touch.

Contact Us

 

Our systems & solutions

Improve Completion System Installation

Introducing AeroSTAT™ Glass Barrier Sub

The AeroSTAT Glass Barrier Sub is designed to improve operations for completion system installation by facilitating casing flotation to planned depth. A glass disc in the sub acts as a barrier that isolates fluid weight above the sub and creates an air chamber that lightens the completion string in the lateral, enabling the system to float as it is run in hole.

The Glass Barrier Sub has many features and benefits

Economic solution for floating system to bottom by creating an air chamber in the liner.

Minimal debris after activation with proprietary glass design

 

Full inside diameter after activation for subsequent operations

Check out this case study and see how the AeroSTAT Glass Barrier Sub simplifies installation in both open and cased hole operations

Read more

Float installations lower costs in extended reach laterals

For more information, contact a sales manager in your region.

Contact Us

 

 

Our systems & solutions

Hydraulically Activated Tools for the First Stage of a Completion System

TREX™ Toe Subs

The Toe-XT™ Testable Hydraulic Sleeve, Toe-AP™ Hydraulic Sleeve and TREX Wet Shoe Sub lower the operational risk associated with coiled tubing runs for the first stage of cemented liner completion systems. These technologies are cost-effective and operationally flexible, helping customers save time and reduce risk when establishing communication with the reservoir post-cementing and prior to stimulation operations.

TREX Toe Subs

Toe-XT Testable Hydraulic Sleeve

Allows the casing string to be pressure tested a single time before opening.

Toe-AP Hydraulic Sleeve

Opens at a specific absolute pressure, saving time and cost in delivering an effective treatment of the first stage.

TREX Wet Shoe Sub

Eliminates the need for a coiled tubing run to perforate the first stage in plug-and-perf operations.

Toe-XT Hydraulic Sleeve

Learn more about pressure-testable toe sleeves with the Toe-XT Hydraulic Sleeve

Toe-XT Hydraulic Sleeve

Check out this case study and find out how the Toe-XT Hydraulic Sleeve is used to pressure test casing integrity prior to stimulation operations

Read more

Effective stimulation with Packers Plus TREX cemented completion system

For more information, contact a sales manager in your region.

Contact Us

 

 

Our systems & solutions