StackFRAC® HD-X

Next generation ball-activated system for high stage count completions and optimal treatment rates

The new and improved StackFRAC HD-X multi-stage completion system was specifically designed to provide high stage count completions and enable optimal treatment rates – even at the toe of the well – by reducing wellbore ID restrictions compared to previous iterations of the system. This next generation system was engineered with ball seat increments exceeding the industry standard of 1/16-in. and the latest version can include increments as small as 1/40-in., while proprietary erosion protection ensures each activation ball will land on its corresponding ball seat.

Packers Plus has been a leader in lower completion technology since 2000 and the engineering advancements of StackFRAC HD-X are the result of more than 20 years of continuous innovation. This ball-activated completion system enables a stimulation program to be pumped from start to finish in one continuous operation and is backed by a fully integrated QA/QC process to verify manufacturing precision and operational success at the wellsite.

StackFRAC HD-X is the next generation of ball-activated completions, allowing operators to effectively increase stage counts for extended reach lateral well stimulations

Read more

Montney operator achieves high stage count stimulation with minimal operation time deploying StackFRAC HD-X

Read more

Montney operator achieves top tier returns with StackFRAC HD-X

Read more

StackFRAC HD-X increases stage count for extended reach lateral wells

Read more

Explore all case studies, white papers and SPE papers

Learn more about Open Hole Multi-Stage Completions with StackFRAC HD-X

Prefer to talk to a person? Fill out the form in the link below and a knowledgeable member of our sales team will be in touch.

Our systems & solutions

E-Commerce

Packers Plus tools readily available at the click of a button

Featured Completion Products

Lightning Frac Plug

The Packers Plus Lightning™ Frac Plug combines composite and cast iron slips to firmly lock the plug in place and provide zonal isolation in the wellbore during plug-and-perf completions.

BUY NOW

 

FracPORT Sleeve

The FracPORT™ Sleeve is a ball-activated stimulation and production port. This sliding sleeve is run between two packers to isolate specific zones of the wellbore for targeted hydraulic fracturing.

BUY NOW

 

RockSEAL II Packer

The RockSEAL® II packer is a dual-element open hole packer that provides high-performance zone isolation, ensuring stimulation of the targeted zone and isolation to optimize long-term production.

BUY NOW

 

Prefer to talk to a person?

Fill out the form in the link below and a knowledgeable member of our sales team will be in touch.

Contact Us

 

Our systems & solutions

Sliding Sleeves

Improve well performance with targeted stimulation in cemented wells

Packers Plus sliding sleeves bring the operational efficiency of ball-activated completion technology to cemented liner completions. These multi-stage completion system tools allows for exact placement of a stimulation treatment in one continuous pumping operation, providing operators with an efficient and cost-effective method for completing cemented liner wells.

QuickPORT IV and Diffsuor Sleeves offer many features and benefits

Reduces costs with continuous rigless pumping operation and immediate post-stimulation flowback

Compatible with a variety of Packers Plus tools for a complete wellbore solution

QuickPORT IV Sleeves feature reinforced flow ports to eliminate entry point erosion issues of limited entry treatment

Specially designed coating helps prevent cement from sticking to the sliding sleeves

QuickPORT™ IV Sleeve

Designed for limited entry stimulation, a number of QuickPORT IV Sleeves of the same ball seat size are grouped together to enable multiple, individually isolated fracs in a single treatment stage.

Diffusor® Sleeve

Designed for single point entry stimulation, Diffusor Sleeves allow for exact placement of stimulation treatments in one continuous pumping operation.

Sliding Sleeves

Learn more about ball-activated systems for cemented liners

Packers Plus Sliding Sleeves provide the time and cost efficiencies of ball-activated completions for cemented wellbores

Read more

Maximized efficiency using Diffusor sleeves in hybrid completions

Read more

Successful 80-sleeve TREX QuickPORT IV lower completion

Read more

8 benefits of cemented ball-activated sleeves

Read more

Hybrid systems for extended reach laterals

Read more

Improving cemented liner completions using advanced ball-activated technology

 Our commitment to quality

Packers Plus successful stimulation services begin with a fully integrated quality assurance and quality control (QA/QC) process that begins at the design stage and follows each tool through manufacturing, assembly, testing, shipping and installation. Automation and robotics are incorporated into our proven process to ensure consistency and repeatability of key criteria in each step as we design, develop and manufacture our patented tools and systems. As a commitment to quality and meeting stringent standards, Packers Plus has achieved ISO 9001 certification and  API Q1 Certification for our manufacturing and engineering operations in Edmonton, AB, and ISO 9001 in Houston, TX.

Read more about our world-class manufacturing capabilities.

Our systems & solutions

Liner Hangers

Quality systems for improving completion system installation

Packers Plus liner hanger systems and liner top packers are uniquely designed to reduce operational risk, optimize well performance and provide operators with a range of options to efficiently anchor completion systems in a variety of applications.

The suite of completion liner anchoring tools use premium sealing technology to packoff the annulus and secure the liner in intermediate casing. Innovative anti-preset features ensure reliability and performance, while enabling rotation during installation to overcome challenging sections in the wellbore.

Packers Plus liner hangers offer many features and benefits

PrimeSET reduces time and fluid usage with setting ball retained in running tool during setting operations

Reduced risk with ability to rotate, push and pull in highly deviated wells

Improved operations with an element design that allows for higher circulation rates and run in hole speeds

Unique anti-release mechanism prevents liner disconnect while running in hole or circulating

PrimeSET Liner Hanger

A V0-rated liner hanger system with bi-directional slips to provide maximum sealing and anchoring capabilities for challenging environments, including HPHT applications.

PrimeSET Single Trip Liner Hanger

Installed using a full bore running tool run on tie-back casing, providing the advantage of being tied back into the completion string immediately after setting operations.

TREX Cemented Liner Packer

A liner top packer specially designed to secure the liner in intermediate casing without the need for slips.

PrimeSET Liner Hanger

Learn more about the PrimeSET Liner Hanger

The PrimeSET Liner Hanger is API V0 qualified and has features enabling a smooth system installation to the planned depth

Read more

Robust liner hanger enables rotating while circulating for successful installation in challenging formation

Read more

PrimeSET liner hanger successfully reaches depth and anchors system after aggressive installation

Read more

Stage tool combined with PrimeSET Liner Hanger overcome challenging geology

Read more

Effective stimulation with Packers Plus TREX cemented completion system

 Our commitment to quality

Packers Plus successful stimulation services begin with a fully integrated quality assurance and quality control (QA/QC) process that begins at the design stage and follows each tool through manufacturing, assembly, testing, shipping and installation. Automation and robotics are incorporated into our proven process to ensure consistency and repeatability of key criteria in each step as we design, develop and manufacture our patented tools and systems. As a commitment to quality and meeting stringent standards, Packers Plus has achieved ISO 9001 certification and  API Q1 Certification for our manufacturing and engineering operations in Edmonton, AB, and ISO 9001 in Houston, TX.

Read more about our world-class manufacturing capabilities.

Our systems & solutions

TREX Setting Sleeve

Improving Installation Efficiency for Re-fracturing or Re-entry Operations

The Packers Plus TREX™ Setting Sleeve provides an effective and economic tie-back option when preparing a well for re-fracturing or re-entry operations. The TREX Setting Sleeve is combined with the TREX Running Tool to provide a system that disengages from the liner without a cutting tool and provides an effective transition option at a pre-determined depth without restricting the inside diameter so stimulation treatment can be delivered at high pump rates.

The TREX Setting Sleeve offers many features and benefits

Running tool releases prior to cementing for reduced operational risk

Pre-determined depth of TREX Setting Sleeve ensures effective transition option

Eliminate bond logs and cutting tools for reduced risk and costs

Restore integrity in drilled but uncompleted (DUC) wells if corroded after long delay between installation and stimulation

Read more

TREX Setting Sleeve simplifies re-fracturing operations to reduce time, cost and risk

 Our commitment to quality

Packers Plus successful stimulation services begin with a fully integrated quality assurance and quality control (QA/QC) process that begins at the design stage and follows each tool through manufacturing, assembly, testing, shipping and installation. Automation and robotics are incorporated into our proven process to ensure consistency and repeatability of key criteria in each step as we design, develop and manufacture our patented tools and systems. As a commitment to quality and meeting stringent standards, Packers Plus has achieved ISO 9001 certification and  API Q1 Certification for our manufacturing and engineering operations in Edmonton, AB, and ISO 9001 in Houston, TX.

Read more about our world-class manufacturing capabilities.

Our systems & solutions

TREX™ Lightning Frac Plugs

Improve Operational Efficiency with Composite & Degradable Plugs

We’re providing operators with higher efficiency plug-and-perf systems worldwide. Packers Plus Lightning Frac Plugs improve deployment and reduce/eliminate millout operations, saving time and reducing risk. Each plug is paired with a ball to provide zonal isolation and, with thousands of stages installed in North America, operators are seeing faster millout operations from a shorter plug design and composite slips.

Lightning Frac Plugs have many features and benefits

Improved operations with fast pump-down and quick and/or eliminated millout

Optimize debris management with favorably sized millout cuttings or dissolvable material

Custom stimulation programs by combining a variety of Packers Plus tools to complete the entire lateral

Lightning Frac Plugs

Lightning™ Frac Plug

A combination of composite and cast iron slips, and a short length means quicker millout and fast pump-down operations.

LightningPLUS™ Composite Plug

Fully composite slips result in smaller debris after millout. Uniquely designed anti-preset and anti-prestroke features.

Titanium™ XV Frac Plug

Combining an aluminum body with a dual slip design to handle harsh downhole environments that require high treating pressures.

LightningBOLT™ Dissolvable Plug

Optimal degrade times thanks to our proprietary material and leaves wellbore clear, without millout.

LightningBOLT™ 2 Dissolvable Plug

Dual slip design that maximizes isolation performance during stimulation operations combined with optimal dissolution time.

Learn more about Lightning Frac Plugs

The Lightning Composite Plug includes composite and ceramic upper slips along with cast iron lower slips that help facilitate millout

Read more

Effective stimulation and millout operations achieved TREX completion system

Read more

LightningPLUS Composite Plug overcomes casing deformation issues to simplify installation and deliver successful stimulation

Read more

LightningPLUS Composite Plug Mills Out Quickly With Minimal Debris

 Our commitment to quality

Packers Plus successful stimulation services begin with a fully integrated quality assurance and quality control (QA/QC) process that begins at the design stage and follows each tool through manufacturing, assembly, testing, shipping and installation. Automation and robotics are incorporated into our proven process to ensure consistency and repeatability of key criteria in each step as we design, develop and manufacture our patented tools and systems. As a commitment to quality and meeting stringent standards, Packers Plus has achieved ISO 9001 certification and  API Q1 Certification for our manufacturing and engineering operations in Edmonton, AB, and ISO 9001 in Houston, TX.

Read more about our world-class manufacturing capabilities.

Our systems & solutions

Improve Completion System Installation

Introducing AeroSTAT™ Glass Barrier Sub

The AeroSTAT Glass Barrier Sub is designed to improve operations for completion system installation by facilitating casing flotation to planned depth. A glass disc in the sub acts as a barrier that isolates fluid weight above the sub and creates an air chamber that lightens the completion string in the lateral, enabling the system to float as it is run in hole.

The Glass Barrier Sub has many features and benefits

Economic solution for floating system to bottom by creating an air chamber in the liner.

Minimal debris after activation with proprietary glass design

 

Full inside diameter after activation for subsequent operations

Check out this case study and see how the AeroSTAT Glass Barrier Sub simplifies installation in both open and cased hole operations

Read more

Float installations lower costs in extended reach laterals

For more information, contact a sales manager in your region.

Contact Us

 

 

Our systems & solutions

Hydraulically Activated Tools for the First Stage of a Completion System

TREX™ Toe Subs

The Toe-XT™ Testable Hydraulic Sleeve, Toe-AP™ Hydraulic Sleeve and TREX Wet Shoe Sub lower the operational risk associated with coiled tubing runs for the first stage of cemented liner completion systems. These technologies are cost-effective and operationally flexible, helping customers save time and reduce risk when establishing communication with the reservoir post-cementing and prior to stimulation operations.

TREX Toe Subs

Toe-XT Testable Hydraulic Sleeve

Allows the casing string to be pressure tested a single time before opening.

Toe-AP Hydraulic Sleeve

Opens at a specific absolute pressure, saving time and cost in delivering an effective treatment of the first stage.

TREX Wet Shoe Sub

Eliminates the need for a coiled tubing run to perforate the first stage in plug-and-perf operations.

Toe-XT Hydraulic Sleeve

Learn more about pressure-testable toe sleeves with the Toe-XT Hydraulic Sleeve

Toe-XT Hydraulic Sleeve

Check out this case study and find out how the Toe-XT Hydraulic Sleeve is used to pressure test casing integrity prior to stimulation operations

Read more

Effective stimulation with Packers Plus TREX cemented completion system

For more information, contact a sales manager in your region.

Contact Us

 

 

Our systems & solutions

AeroSTAT™ Glass Barrier Sub

Improve Completion System Installation

The AeroSTAT Glass Barrier Sub is designed to improve operations for completion system installation by facilitating casing flotation to planned depth. A glass disc in the sub acts as a barrier that isolates fluid weight above the sub and creates an air chamber that lightens the completion string in the lateral, enabling the system to float as it is run in hole.

The Glass Barrier Sub offers many features and benefits

Economic solution for floating system to bottom by creating an air chamber in the liner

Minimal debris after activation with proprietary glass design

Full inside diameter after activation for subsequent operations

The AeroSTAT Glass Barrier Sub simplifies installation in both open and cased hole operations.

Read more

Float installations lower costs in extended reach laterals

 Our commitment to quality

Packers Plus successful stimulation services begin with a fully integrated quality assurance and quality control (QA/QC) process that begins at the design stage and follows each tool through manufacturing, assembly, testing, shipping and installation. Automation and robotics are incorporated into our proven process to ensure consistency and repeatability of key criteria in each step as we design, develop and manufacture our patented tools and systems. As a commitment to quality and meeting stringent standards, Packers Plus has achieved ISO 9001 certification and  API Q1 Certification for our manufacturing and engineering operations in Edmonton, AB, and ISO 9001 in Houston, TX.

Read more about our world-class manufacturing capabilities.

Our systems & solutions