StackFRAC HD-X enables higher pump rates and tonnage for increased production in extended reach lateral
Wireline shifting BHA enables operator to reduce operation costs and benefit from flexibility of closeable sliding sleeves
Montney operator achieves high stage count stimulation with minimal operation time deploying StackFRAC HD-X
Toughen Up: Mitigate erosion for high-volume proppant completions
Go with the Flow: Reduce Water Costs Using Continuous Pumping Completions
Montney operator achieves top tier returns with StackFRAC HD-X
Montney operator improves production using StackFRAC HD-X system
Completion advancements and rigorous QA/QC combine for successful high density stimulation in long lateral
Breaking Ground: Energy conservation and generating fracture complexity
Going the Extra Mile: Using ball-activated systems to simplify stimulation of toe stages for extended reach laterals
StackFRAC HD-X increases stage count for extended reach lateral wells