TREX™ Toe Subs

Hydraulically Activated Tools for the First Stage of a Completion System

The Toe-XT™ Testable Hydraulic Sleeve, Toe-AP™ Hydraulic Sleeve and TREX Wet Shoe Sub lower the operational risk associated with coiled tubing runs for the first stage of cemented liner completion systems. These technologies are cost-effective and operationally flexible, helping customers save time and reduce risk when establishing communication with the reservoir post-cementing and prior to stimulation operations.

TREX Toe Subs offer many features and benefits

The Toe-XT Testable Hydraulic Sleeve allows the casing string to be pressure tested a single time before opening.

The Toe-AP Hydraulic Sleeve opens at a specific absolute pressure, saving time and cost in delivering an effective treatment of the first stage.

The TREX Wet Shoe Sub eliminates the need for a coiled tubing run to perforate the first stage in plug-and-perf operations.

Toe-XT Hydraulic Sleeve

Learn more about pressure-testable toe sleeves with the Toe-XT Hydraulic Sleeve

 

The Toe-XT Hydraulic Sleeve is used to pressure test casing integrity prior to stimulation operations

Read more

Effective stimulation with Packers Plus TREX cemented completion system

Our commitment to quality

Packers Plus successful stimulation services begin with a fully integrated quality assurance and quality control (QA/QC) process that begins at the design stage and follows each tool through manufacturing, assembly, testing, shipping and installation. Automation and robotics are incorporated into our proven process to ensure consistency and repeatability of key criteria in each step as we design, develop and manufacture our patented tools and systems. As a commitment to quality and meeting stringent standards, Packers Plus has achieved ISO 9001 certification and  API Q1 Certification for our manufacturing and engineering operations in Edmonton, AB, and ISO 9001 in Houston, TX.

Read more about our world-class manufacturing capabilities.

Our systems & solutions

New!

AeroSTAT™ Glass Barrier Sub

Improve Completion System Installation

LightningBOLT Dissolvable Plug

LightningBOLT Dissolvable Plug

LightningPLUS Composite Plug

LightningPLUS Composite Plug

Lightning Composite Plug

Lightning Composite Plug

SF Cementor D Stage Collar

Cementing Tool for Monobore Completions

TREX PrimeSET Liner Hanger

PrimeSET Liner Hanger

StackFRAC HD-X System

Multi-Stage Ball-Drop Completions

TREX Limited Entry

Cemented QuickPORT IV Sleeves

Inferno™ Ball-Activated Steam Valve

Advanced Completion Technology for SAGD Operations

StackFRAC Slimhole System

Restimulation & Well Recovery

ePLUS Retina Monitoring System

Combining Electronics with Reliability