Proven Performance

Read how Packers Plus systems and solutions have delivered results around the world.

Accelerating Efficiency: 8 Benefits of Cemented Ball-Activated Sleeves
Going the Extra Mile: Using ball-activated systems to simplify stimulation of toe stages for extended reach laterals
Breaking Ground: Energy conservation and generating fracture complexity
Limited Entry Revolution: Improving Cemented Liner Completions with Advanced Ball-Drop Technology
Boosting Recovery: Improve ultimate recovery using a limited entry waterflood system
Make Better Decisions: Get critical knowledge with real-time monitoring during fracture operations