Well Construction Versatility: Reducing costs and mitigating risk for cemented-back completions using stage tool technology

During well construction, multiple drill bit and casing sizes are required to reach the horizontal section. This is an expensive part of well operations with opportunities and solutions for improved operational efficiency and cost savings. This white paper discusses monobore completions and offers a few solutions to reduce time and risk during drilling and completions operations.

download now