101230 – An Effective Horizontal Well Completion and Stimulation System

Summary

This paper will detail a new completion system which is run as part of the production liner, which does not require cementing and provides positive mechanical diversion at specified intervals, so fracturing and stimulations can be pumped effectively to their targeted zone. Details of the engineering design and testing will be specified, with elaboration on the applications and case histories were these systems have been successfully deployed.

The paper presents case studies that detail the operational efficiencies of the system in conjunction with enhanced production.