Featured Case Study
An Operator wanted to prove gas reserves in the Ain Tsila field of Eastern Algeria. The completion needed to accommodate both horizontal and vertical wells and allow the Operator to test production, stage-by-stage, both before and after stimulation. A Packers Plus StageFRAC® system was run using Drillable Closeable (DC) FracPORT™ sleeves to enable the Operator to open and close each stage as needed to test the production from all zones individually. Four appraisal wells were completed and all testing and stimulation goals were fulfilled without a rig present, within the designed time frame and below budget.
We work for customers around the world. Each customer comes to us with a need to increase production and improve efficiency in low permeability reservoirs. With over 8,500 systems installed globally, we have more experience with open hole completions than anyone else in the world. Review our wide-range of experience in a variety of reservoirs through our Case Studies below.
Please click on the links below to download the case study that most closely aligns with your needs.